Site Navigation

Your Account

Choose Language

Changes to Step #36

Edit by MatterHackers

Edit approved by MatterHackers

Deleted
Added
Unchanged

Step Lines

[title] Torque down nozzle
[* black] The step everyone forgets when putting their E3D together.
[*
black] Bring the hotendhot end up to temperature (260C) and260°C), then tighten down the nozzle with a 7mm wrench.
[* blackicon_note] If you don't do this itstep is omitted the nozzle will work its way loose from the heat block and leak plastic will ooze from the threads.
[* black] The step everyone forgets when putting their E3D together.
[*
black] Bring the hotendhot end up to temperature (260C) and260°C), then tighten down the nozzle with a 7mm wrench.
[* blackicon_note] If you don't do this itstep is omitted the nozzle will work its way loose from the heat block and leak plastic will ooze from the threads.

Image 1

No previous image

Added